223 real product recordsOEM / ODM supportFactory quotation by inquiry

OEM / ODM DEVELOPMENT

Make the squeeze
your own.

Start from a real catalogue product or brief a new direction. We review the technical and commercial route before committing to price, MOQ or lead time.

EXISTING STYLESCUSTOM MOULDSPRIVATE LABELRETAIL PACKAGING
A · PRODUCT

Shape, scale and tactile direction

Review food, animal, character-free, seasonal, desk-toy and promotional shapes in multiple sizes.

  • Existing SKU adaptation for faster development
  • New shape review from sketches, drawings or physical samples
  • Firmness, rebound speed, surface feel and filling direction
B · MATERIAL

Choose the feel for the channel

Available catalogue directions include maltose-gel compounds, TPR, PU slow-rise foam, flour-filled, bead-filled and mixed tactile structures.

  • Material and construction are confirmed per product
  • Leakage, seam, surface and warning considerations are reviewed
  • Sample approval defines the final production reference
C · VISUAL

Colour, finish and brand system

Build colourways and surface effects that fit your shelf, marketplace listing or seasonal launch.

  • Solid, marbled, glitter, translucent and glow directions
  • Logo position and private-label artwork review
  • Original designs only; third-party IP requires valid authorization
D · PACKAGING

Plan the retail format before quotation

Packaging changes cost, carton efficiency, compliance information and shelf presentation.

  • Individual bags, window boxes and display trays
  • Barcode, warning, age-grade and country label positions
  • Assortment, inner pack and master carton planning

DEVELOPMENT FLOW

Clear checkpoints before bulk production.

The final route depends on whether you use an existing style, change packaging or open a new custom mould.

01

Commercial brief

Target market, buyer channel, quantity, budget direction, delivery window and required retail format.

02

Product route

Choose an existing SKU, adapt a factory style or review a new shape and mould route.

03

Sample definition

Confirm material, size, colour, firmness, rebound, filling, scent, finish and packaging concept.

04

Sample approval

Review the sample and artwork before the bulk specification is locked.

05

Production & packing

Arrange production, agreed checks, labels, inner pack, display pack and export carton.

06

Shipment coordination

Confirm final carton information and hand over to the agreed freight route.

WA Request quote